WWTP Maintenance and Shutdown Works3rd March 2015

 

AHS have completed several large WWTP shutdowns from bulk DIGESTER and CLARIFIER waste removal through to lagoon de-silting and pump well vacuum waste removal works.

One such digester was located in the Wide Bay region.  Material had accumulated over a thirty year period and was prone to odour, there was also concern that this could be exacerbated during the cleaning process.  A condition of this work being done was that all waste be extracted without odour in accordance with the clients high HSEQ standards.

Not only was this all achieved but we were also able to partner with our client in creating a sustainable treatment solution to enable the material to be used as a safe form of soil conditioner.

 

 

 