GCLR Stage 2 – Southern Section PUP Investigation

Principal – TMR

Completion Date – September 2015

Project Scope – To undertake an investigation of existing utility services for a proposed route of the southern section of Stage 2 of the Gold Coast Light Rail

The PUP investigation adopted a two stage process with the initial stage requiring cable locating and GPR and also pothole and strip trench locating. Undertaking the initial stage aimed at improving efficiency and also identifying utility services that were not shown on the provided project plans.  It was evident from undertaking this process that hydro excavation via potholing with some strip trenches would be required.  Strip trenches were a necessity due to the number of utility services in each location and the small amount of separation between the utility services.  By undertaking strip trench methodology a larger area was investigated therefore providing a more detailed investigation.

Related Posts

  • Subsurface Utility Engineering (SUE): Reducing Risk and Improving Projects

    Construction and infrastructure projects across Australia face numerous challenges, from managing budgets and timelines to ensuring safety and minimising disruptions.

    Read more
  • Underground pipes exposed

    PUP Underground Locating: Essential for Safe Excavation

    Excavation is a necessary activity which ranges from large infrastructure projects to smaller residential works.

    Read more
  • A workman undertaking non-destructive digging

    Non-Destructive Digging: The Safe and Efficient Way to Excavate

    Traditional excavation methods, involving heavy machinery and extensive digging, often pose significant risks to underground utilities, the environment, and worker safety.

    Read more
  • Talk with us today to find out more

    Please call and speak with one of our friendly members of staff or send us an email using our contact form